Triple

T6152636
Position Surface form Disambiguated ID Type / Status
Subject Iberia Plus E137240 entity
Predicate statusRequirement P43873 FINISHED
Object tier points LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: tier points | Statement: [Iberia Plus, statusRequirement, tier points]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: statusRequirement
Context triple: [Iberia Plus, statusRequirement, tier points]
  • A. requiresStatus chosen
    Indicates that one entity can only proceed, be valid, or be applied if another entity has a specified status or condition.
  • B. evaluationRequirement
    Indicates that one entity imposes or specifies conditions under which another entity must be assessed, tested, or evaluated.
  • C. establishedRequirement
    Indicates that one entity has formally set or defined a requirement that another entity is expected to satisfy or comply with.
  • D. dialogRequirement
    Indicates that a certain condition, piece of information, or interaction must occur within a dialog or conversation for a related action, state, or process to proceed or be considered valid.
  • E. maintenanceRequirement
    Indicates that an entity is obligated to perform, schedule, or adhere to specific maintenance activities or conditions for another entity or system.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008a45d008190832a9e19f5d63406 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c05cfe20408190b5ec9b987e1a4206 completed March 22, 2026, 9:19 p.m.
PD Predicate disambiguation batch_69c055f39e0881909ae56444b1b48929 completed March 22, 2026, 8:49 p.m.
Created at: March 22, 2026, 4:16 p.m.