Triple

T6141268
Position Surface form Disambiguated ID Type / Status
Subject Clifton Suspension Bridge E136966 entity
Predicate constructionResumedDate P5779 FINISHED
Object 1862 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1862 | Statement: [Clifton Suspension Bridge, constructionResumedDate, 1862]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionResumedDate
Context triple: [Clifton Suspension Bridge, constructionResumedDate, 1862]
  • A. constructionResumed chosen
    Indicates that previously halted construction activity on an entity or project has started again.
  • B. constructionStartAfter
    Indicates that the start of one construction activity or project occurs after the start of another specified construction activity or project.
  • C. constructionDate
    Indicates the date on which an entity (such as a building or structure) was constructed or completed.
  • D. reconstructionEndDate
    Indicates the date on which a reconstruction process or project is completed.
  • E. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008a179388190a3b5a081bbf46d55 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c05cb2404c8190bbbfa78d5f49389f completed March 22, 2026, 9:18 p.m.
PD Predicate disambiguation batch_69c055f19b0c81908be34a00ab218723 completed March 22, 2026, 8:49 p.m.
Created at: March 22, 2026, 4:16 p.m.