Triple

T614094
Position Surface form Disambiguated ID Type / Status
Subject Wuhan Optics Valley E12164 entity
Predicate instanceOf P0 FINISHED
Object high-tech development zone C26 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high-tech development zone
Context triple: [Wuhan Optics Valley, instanceOf, high-tech development zone]
  • A. development corridor
    A development corridor is a strategically planned geographic area, often aligned along major transportation routes, where concentrated investment in infrastructure, industry, and services is used to stimulate economic growth and regional integration.
  • B. regional center
    A regional center is an organization or facility that provides specialized services, coordination, and support to a defined geographic area, often acting as a hub for resources, administration, or expertise.
  • C. mixed-use development district
    A mixed-use development district is a designated urban area that intentionally combines residential, commercial, recreational, and sometimes industrial uses within a walkable, integrated environment to promote vibrant, efficient, and sustainable community life.
  • D. technology region chosen
    A technology region is a geographically defined area characterized by a high concentration of technology-related activities, infrastructure, companies, and talent that collectively drive innovation and economic growth.
  • E. special-purpose district
    A special-purpose district is a limited-purpose local government entity created to perform a specific public function or set of functions—such as water supply, transportation, or education—within a defined geographic area.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493309df48190a327f748e88049a6 completed March 1, 2026, 7:27 p.m.
Created at: March 1, 2026, 7:35 p.m.