Triple

T6131781
Position Surface form Disambiguated ID Type / Status
Subject Epic Waters Indoor Waterpark E136735 entity
Predicate instanceOf P0 FINISHED
Object indoor water park C19979 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: indoor water park
Context triple: [Epic Waters Indoor Waterpark, instanceOf, indoor water park]
  • A. indoor theme park
    An indoor theme park is a fully enclosed entertainment complex featuring climate-controlled rides, attractions, games, and themed environments designed for year-round enjoyment regardless of weather conditions.
  • B. water ride
    A water ride is an amusement attraction that uses water-filled channels, flumes, or pools to move riders through themed environments, often featuring splashes, drops, and soaking elements for entertainment.
  • C. indoor roller coaster
    An indoor roller coaster is an amusement ride featuring a track-based, high-speed vehicle system enclosed within a building, often enhanced with controlled lighting, sound, and themed environments.
  • D. adventure park
    An adventure park is a recreational facility offering a variety of physically engaging and often adrenaline-inducing outdoor activities, such as zip lines, climbing courses, and obstacle challenges, designed for fun, fitness, and exploration.
  • E. indoor aquarium
    An indoor aquarium is a controlled, enclosed environment within a building designed to house and display aquatic life in water-filled tanks for observation, education, and enjoyment.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008a0a37c81908e5b4f879158afb3 completed March 22, 2026, 3:20 p.m.
Created at: March 22, 2026, 4:15 p.m.