Triple

T6129160
Position Surface form Disambiguated ID Type / Status
Subject U.S. Route 27 E136665 entity
Predicate connectsTo P845 FINISHED
Object Interstate 64 E236988 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 64 | Statement: [U.S. Route 27, connectsTo, Interstate 64]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 64
Context triple: [U.S. Route 27, connectsTo, Interstate 64]
  • A. Interstate 64 chosen
    Interstate 64 is a major east–west U.S. Interstate Highway running from Missouri to Virginia, connecting Midwestern cities to the Atlantic coast.
  • B. Interstate 640
    Interstate 640 is an auxiliary beltway of Interstate 40 that serves as a northern bypass around Knoxville, Tennessee.
  • C. Interstate 24
    Interstate 24 is a major east–west U.S. highway running through the central United States, connecting cities in states such as Illinois, Kentucky, Tennessee, and Georgia.
  • D. Interstate 69
    Interstate 69 is a major north–south U.S. highway that runs through multiple states in the Midwest and South, serving as an important regional and interstate transportation route.
  • E. Interstate 68
    Interstate 68 is an east–west U.S. highway running through northern West Virginia and western Maryland, providing a key Appalachian corridor connecting Morgantown to I-79 and I-70.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008a0a37c81908e5b4f879158afb3 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c05c4c8570819096dc87f0de2a9887 completed March 22, 2026, 9:17 p.m.
NED1 Entity disambiguation (via context triple) batch_69c963dc62f88190b2aff49f5cb5fe27 completed March 29, 2026, 5:39 p.m.
Created at: March 22, 2026, 4:15 p.m.