Triple

T6125416
Position Surface form Disambiguated ID Type / Status
Subject NASA Space Communications and Navigation program E136583 entity
Predicate instanceOf P0 FINISHED
Object space communications program C19971 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: space communications program
Context triple: [NASA Space Communications and Navigation program, instanceOf, space communications program]
  • A. space communication project
    A space communication project is an organized effort to design, develop, and operate systems that enable reliable data and signal exchange between spacecraft, satellites, and ground stations.
  • B. space technology development program
    A space technology development program is an organized initiative that researches, designs, tests, and matures advanced space-related technologies to enable or enhance future space missions and capabilities.
  • C. space exploration programme
    A space exploration programme is an organized, long-term initiative that plans, funds, and conducts missions and research activities to explore outer space and expand scientific and technological knowledge.
  • D. satellite program
    A satellite program is an organized initiative that designs, builds, launches, and operates satellites to achieve specific objectives such as communication, Earth observation, navigation, or scientific research.
  • E. space communication network
    A space communication network is an interconnected system of ground stations, satellites, and relay nodes that enables the reliable transmission, routing, and reception of data across space and between space-based and terrestrial assets.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008a0a37c81908e5b4f879158afb3 completed March 22, 2026, 3:20 p.m.
Created at: March 22, 2026, 4:14 p.m.