Triple

T6105466
Position Surface form Disambiguated ID Type / Status
Subject Georgia State Route 81 E136105 entity
Predicate hasJunctionWith P1018 FINISHED
Object Interstate 20 near Covington, Georgia
Interstate 20 near Covington, Georgia is a major east–west freeway segment of I-20 that serves the Covington area as part of the primary route connecting Atlanta with Augusta and points farther east and west.
E568490 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 20 near Covington, Georgia | Statement: [Georgia State Route 81, hasJunctionWith, Interstate 20 near Covington, Georgia]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 20 near Covington, Georgia
Context triple: [Georgia State Route 81, hasJunctionWith, Interstate 20 near Covington, Georgia]
  • A. Interstate 24 near Wildwood, Georgia
    Interstate 24 near Wildwood, Georgia is a key highway junction in northwestern Georgia where I-24 connects with Interstate 59, linking traffic between the Chattanooga area and points southwest toward Alabama.
  • B. Interstate 985 near Gainesville, Georgia
    Interstate 985 near Gainesville, Georgia is a limited-access highway spur of I-85 that serves as a primary route connecting the Atlanta metropolitan area to Gainesville and the northeast Georgia region.
  • C. Interstate 75 near Rome, Georgia
    Interstate 75 near Rome, Georgia is a major north–south U.S. interstate corridor in northwest Georgia that provides regional access to the Rome area and connects it to larger cities such as Atlanta and Chattanooga.
  • D. Interstate 75 in Georgia
    Interstate 75 in Georgia is a major north–south freeway that serves as a primary transportation corridor through the state, connecting cities like Valdosta, Macon, and Atlanta as part of the national Interstate Highway System.
  • E. Interstate 75 near Perry, Georgia
    Interstate 75 near Perry, Georgia is a major north–south interstate highway segment in central Georgia that serves as a key transportation corridor for regional and long-distance traffic.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Interstate 20 near Covington, Georgia
Triple: [Georgia State Route 81, hasJunctionWith, Interstate 20 near Covington, Georgia]
Generated description
Interstate 20 near Covington, Georgia is a major east–west freeway segment of I-20 that serves the Covington area as part of the primary route connecting Atlanta with Augusta and points farther east and west.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Interstate 20 near Covington, Georgia
Target entity description: Interstate 20 near Covington, Georgia is a major east–west freeway segment of I-20 that serves the Covington area as part of the primary route connecting Atlanta with Augusta and points farther east and west.
  • A. Interstate 24 near Wildwood, Georgia
    Interstate 24 near Wildwood, Georgia is a key highway junction in northwestern Georgia where I-24 connects with Interstate 59, linking traffic between the Chattanooga area and points southwest toward Alabama.
  • B. Interstate 985 near Gainesville, Georgia
    Interstate 985 near Gainesville, Georgia is a limited-access highway spur of I-85 that serves as a primary route connecting the Atlanta metropolitan area to Gainesville and the northeast Georgia region.
  • C. Interstate 75 near Rome, Georgia
    Interstate 75 near Rome, Georgia is a major north–south U.S. interstate corridor in northwest Georgia that provides regional access to the Rome area and connects it to larger cities such as Atlanta and Chattanooga.
  • D. Interstate 75 in Georgia
    Interstate 75 in Georgia is a major north–south freeway that serves as a primary transportation corridor through the state, connecting cities like Valdosta, Macon, and Atlanta as part of the national Interstate Highway System.
  • E. Interstate 75 near Perry, Georgia
    Interstate 75 near Perry, Georgia is a major north–south interstate highway segment in central Georgia that serves as a key transportation corridor for regional and long-distance traffic.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0087dee9881909e3655be88208c01 completed March 22, 2026, 3:19 p.m.
NER Named-entity recognition batch_69c05b7ee8b48190b87f5ec8a46d6e2d completed March 22, 2026, 9:13 p.m.
NED1 Entity disambiguation (via context triple) batch_69c1255759f48190a6aadf33406dcb49 completed March 23, 2026, 11:34 a.m.
NEDg Description generation batch_69c1275910108190a0a5f458a468c292 completed March 23, 2026, 11:43 a.m.
NED2 Entity disambiguation (via description) batch_69c127b831d081909436a62e002d1fa5 completed March 23, 2026, 11:44 a.m.
Created at: March 22, 2026, 4:13 p.m.