Triple

T6105438
Position Surface form Disambiguated ID Type / Status
Subject Georgia State Route 81 E136105 entity
Predicate abbreviation P43 FINISHED
Object GA 81
GA 81 is a state highway in Georgia that connects several communities in the north-central part of the state.
E568486 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: GA 81 | Statement: [Georgia State Route 81, abbreviation, GA 81]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: GA 81
Context triple: [Georgia State Route 81, abbreviation, GA 81]
  • A. GA 85
    GA 85 is a state highway in Georgia that runs generally south–north, connecting rural communities and suburbs to the Atlanta metropolitan area.
  • B. GA 38
    GA 38 is a state highway in Georgia that runs east–west across the southern part of the state, connecting several communities and major routes.
  • C. GA 16
    GA 16 is a state highway in Georgia that runs east–west across the central part of the state, connecting several towns and major routes.
  • D. GA 55
    GA 55 is a state highway in Georgia that serves as a regional connector route through several counties in the state.
  • E. GA-1
    GA-1 is the abbreviated designation for Georgia State Route 1, a major north–south state highway running through western Georgia.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: GA 81
Triple: [Georgia State Route 81, abbreviation, GA 81]
Generated description
GA 81 is a state highway in Georgia that connects several communities in the north-central part of the state.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: GA 81
Target entity description: GA 81 is a state highway in Georgia that connects several communities in the north-central part of the state.
  • A. GA 85
    GA 85 is a state highway in Georgia that runs generally south–north, connecting rural communities and suburbs to the Atlanta metropolitan area.
  • B. GA 38
    GA 38 is a state highway in Georgia that runs east–west across the southern part of the state, connecting several communities and major routes.
  • C. GA 16
    GA 16 is a state highway in Georgia that runs east–west across the central part of the state, connecting several towns and major routes.
  • D. GA 55
    GA 55 is a state highway in Georgia that serves as a regional connector route through several counties in the state.
  • E. GA-1
    GA-1 is the abbreviated designation for Georgia State Route 1, a major north–south state highway running through western Georgia.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0087dee9881909e3655be88208c01 completed March 22, 2026, 3:19 p.m.
NER Named-entity recognition batch_69c05b7ee8b48190b87f5ec8a46d6e2d completed March 22, 2026, 9:13 p.m.
NED1 Entity disambiguation (via context triple) batch_69c1255759f48190a6aadf33406dcb49 completed March 23, 2026, 11:34 a.m.
NEDg Description generation batch_69c1275910108190a0a5f458a468c292 completed March 23, 2026, 11:43 a.m.
NED2 Entity disambiguation (via description) batch_69c127b831d081909436a62e002d1fa5 completed March 23, 2026, 11:44 a.m.
Created at: March 22, 2026, 4:13 p.m.