Triple

T6077056
Position Surface form Disambiguated ID Type / Status
Subject Tyne Valley line E135426 entity
Predicate followsValleyOf P3944 FINISHED
Object River Tyne E144716 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: River Tyne | Statement: [Tyne Valley line, followsValleyOf, River Tyne]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: River Tyne
Context triple: [Tyne Valley line, followsValleyOf, River Tyne]
  • A. River Tyne chosen
    The River Tyne is a major river in North East England that flows through Newcastle upon Tyne and Gateshead before reaching the North Sea.
  • B. Tyne and Tees
    Tyne and Tees was the nickname of the British 50th (Northumbrian) Infantry Division, a renowned World War II formation noted for its role in major campaigns including the Normandy landings.
  • C. River Ouse
    The River Ouse is a major river in East Sussex, England, flowing through towns such as Lewes before reaching the English Channel at Newhaven.
  • D. River Ouse
    The River Ouse is a major river in North Yorkshire, England, flowing through the historic city of York and forming part of the Humber river system before reaching the North Sea.
  • E. Severn
    The Severn is the longest river in Great Britain, flowing through Wales and England before emptying into the Bristol Channel.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0087ad31c8190ab936e0ff28614b6 completed March 22, 2026, 3:19 p.m.
NER Named-entity recognition batch_69c0576ef2c88190b0ec62e9f041d176 completed March 22, 2026, 8:56 p.m.
NED1 Entity disambiguation (via context triple) batch_69c14153e95081909e0d77cb48733561 completed March 23, 2026, 1:34 p.m.
Created at: March 22, 2026, 4:11 p.m.