Triple

T6028682
Position Surface form Disambiguated ID Type / Status
Subject Fort Peck Lake E134243 entity
Predicate partOf P40 FINISHED
Object Fort Peck Project E449298 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Fort Peck Project | Statement: [Fort Peck Lake, partOf, Fort Peck Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Fort Peck Project
Context triple: [Fort Peck Lake, partOf, Fort Peck Project]
  • A. Fort Peck Dam chosen
    Fort Peck Dam is a massive earthfill dam in northeastern Montana that creates Fort Peck Lake and plays a key role in flood control, hydroelectric power generation, and water management in the Missouri River system.
  • B. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • C. Buffalo Bill Dam
    Buffalo Bill Dam is a historic concrete arch-gravity dam on the Shoshone River in Wyoming, once one of the tallest in the world and now a key engineering landmark and visitor attraction.
  • D. Colorado-Big Thompson Project
    The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
  • E. Chena River Lakes Flood Control Project
    The Chena River Lakes Flood Control Project is a U.S. Army Corps of Engineers system of dams, levees, and related structures near Fairbanks, Alaska, designed to reduce flooding along the Chena River and protect surrounding communities.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0087515148190a97475d412563865 completed March 22, 2026, 3:19 p.m.
NER Named-entity recognition batch_69c0560fdc84819093abba13054ea1ee completed March 22, 2026, 8:50 p.m.
NED1 Entity disambiguation (via context triple) batch_69c1356aa44c8190aa2602bf77c00d2f completed March 23, 2026, 12:43 p.m.
Created at: March 22, 2026, 4:07 p.m.