Triple

T6022621
Position Surface form Disambiguated ID Type / Status
Subject Waste Isolation Pilot Plant E134098 entity
Predicate primaryWasteSource P32799 FINISHED
Object U.S. nuclear weapons production complex E11066 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. nuclear weapons production complex | Statement: [Waste Isolation Pilot Plant, primaryWasteSource, U.S. nuclear weapons production complex]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. nuclear weapons production complex
Context triple: [Waste Isolation Pilot Plant, primaryWasteSource, U.S. nuclear weapons production complex]
  • A. United States nuclear weapons complex chosen
    The United States nuclear weapons complex is the nationwide network of laboratories, production plants, and storage facilities responsible for the research, development, maintenance, and dismantlement of the U.S. nuclear arsenal.
  • B. Pantex Plant
    Pantex Plant is a U.S. nuclear weapons facility in Texas responsible for the assembly, disassembly, and maintenance of the nation’s nuclear warheads.
  • C. Manhattan Project sites
    Manhattan Project sites are historically significant locations across the United States associated with the research, development, and testing of the first nuclear weapons during World War II.
  • D. Y-12 National Security Complex
    The Y-12 National Security Complex is a U.S. Department of Energy facility central to nuclear weapons production, uranium processing, and national security operations.
  • E. U.S. thermonuclear weapons program
    The U.S. thermonuclear weapons program was the Cold War-era American effort to design, test, and deploy hydrogen bombs and other advanced nuclear weapons, fundamentally shaping global nuclear strategy and arms races.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: primaryWasteSource
Context triple: [Waste Isolation Pilot Plant, primaryWasteSource, U.S. nuclear weapons production complex]
  • A. pollutionSource
    Indicates that one entity is the origin or cause of pollution affecting another entity or environment.
  • B. wasteManagement
    Indicates the handling, treatment, and disposal relationship between entities and the waste materials they produce or manage.
  • C. primaryFeedstock
    Indicates that one entity serves as the main raw material or input used to produce, process, or operate another entity.
  • D. isMajorSourceOf chosen
    Indicates that one entity serves as a primary or dominant origin, cause, or provider of another entity or effect.
  • E. primarySources
    Indicates that one entity serves as an original, authoritative source of information or evidence for another entity.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008742a5c8190b9cb9c2787a3d8b3 completed March 22, 2026, 3:19 p.m.
NER Named-entity recognition batch_69c04fbbf03c8190baf449a5d393af5c completed March 22, 2026, 8:23 p.m.
NED1 Entity disambiguation (via context triple) batch_69c1136da26081909b753fa8a2a91084 completed March 23, 2026, 10:18 a.m.
PD Predicate disambiguation batch_69c049e75b3881908be106fbcf8c68d4 completed March 22, 2026, 7:58 p.m.
Created at: March 22, 2026, 4:07 p.m.