Triple

T6010271
Position Surface form Disambiguated ID Type / Status
Subject CMS control room E133813 entity
Predicate instanceOf P0 FINISHED
Object operations center C1321 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: operations center
Context triple: [CMS control room, instanceOf, operations center]
  • A. police operations center
    A police operations center is a centralized facility where law enforcement personnel monitor incidents, coordinate field units, manage communications, and make real-time decisions to ensure public safety and effective response.
  • B. centralized monitoring center chosen
    A centralized monitoring center is a dedicated facility that aggregates, analyzes, and manages real-time data and alerts from distributed systems or locations to enable coordinated oversight and rapid response.
  • C. operational unit
    An operational unit is an organized group, department, or component within a larger system that performs specific tasks or functions to achieve defined operational objectives.
  • D. network operations facility
    A network operations facility is a centralized, secure environment where personnel and systems monitor, manage, and maintain an organization’s communication networks and related infrastructure to ensure reliable, efficient, and secure operations.
  • E. data center
    A data center is a specialized facility that houses networked computer systems, storage, and infrastructure to process, manage, and store large volumes of digital data.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0087361a48190905c6b55969852b8 completed March 22, 2026, 3:19 p.m.
Created at: March 22, 2026, 4:06 p.m.