Triple
T5979366
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ho Chi Minh Trail |
E133080
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | logistical network |
C4130
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: logistical network Context triple: [Ho Chi Minh Trail, instanceOf, logistical network]
-
A.
logistical operation
A logistical operation is a coordinated set of activities and processes that plan, implement, and control the efficient movement and storage of goods, information, or resources from origin to destination.
-
B.
manufacturing network
A manufacturing network is an interconnected system of facilities, suppliers, technologies, and logistics that collaboratively plan, produce, and distribute goods across multiple locations.
-
C.
transport infrastructure network
chosen
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
D.
freight railroad network
A freight railroad network is an interconnected system of rail lines, terminals, and supporting infrastructure designed to transport goods and raw materials efficiently between industrial, commercial, and logistical hubs.
-
E.
Infrastructure for trade
Infrastructure for trade encompasses the physical, digital, and institutional systems—such as transportation networks, ports, logistics hubs, communication technologies, and regulatory frameworks—that enable the efficient exchange of goods and services across regions and markets.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0086f45e8819098f73dd16d45ec9d |
completed | March 22, 2026, 3:19 p.m. |
Created at: March 22, 2026, 4:04 p.m.