Triple
T59461
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | U.S. Route 90 in Florida |
E1178
|
entity |
| Predicate | easternTerminusAt |
P390
|
FINISHED |
| Object | U.S. Route 1 in Jacksonville, Florida |
E543
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 1 in Jacksonville, Florida | Statement: [U.S. Route 90 in Florida, easternTerminusAt, U.S. Route 1 in Jacksonville, Florida]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: U.S. Route 1 in Jacksonville, Florida Context triple: [U.S. Route 90 in Florida, easternTerminusAt, U.S. Route 1 in Jacksonville, Florida]
-
A.
U.S. Route 90 in Florida
U.S. Route 90 in Florida is a major east–west highway that parallels Interstate 10 across the Florida Panhandle and northern Florida, connecting cities such as Pensacola, Tallahassee, and Jacksonville.
-
B.
U.S. Route 1
chosen
U.S. Route 1 is a major north–south United States highway running along the East Coast from Key West, Florida, to Fort Kent, Maine.
-
C.
U.S. Route 101 (nearby)
U.S. Route 101 is a major north–south U.S. highway running along much of the West Coast, serving key urban and suburban areas in California, Oregon, and Washington.
-
D.
U.S. Route 2 in Maine
U.S. Route 2 in Maine is a major east–west highway crossing the state’s interior, connecting rural communities and regional centers between New Hampshire and the Bangor area.
-
E.
U.S. Route 9
U.S. Route 9 is a major north–south U.S. highway running along the East Coast, primarily through New York and New Jersey, connecting numerous cities and historic communities.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: easternTerminusAt Context triple: [U.S. Route 90 in Florida, easternTerminusAt, U.S. Route 1 in Jacksonville, Florida]
-
A.
terminusNorth
Indicates that one entity serves as the northern endpoint or final stop of another entity, such as a route, line, or path.
-
B.
terminusCity
Indicates that a transportation route or service ends or has its final stop in a particular city.
-
C.
terminus
Indicates that one entity serves as the final endpoint or stopping place for another entity’s movement, route, or process.
-
D.
endPoint
chosen
Indicates the terminal location, limit, or final state reached by an object, process, or path in a given relationship or action.
-
E.
railwayLine
Indicates that there is a railway line connection or route associated with or passing through the referenced entity.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a24a552ef88190a0df287d68c65cba |
completed | Feb. 28, 2026, 1:52 a.m. |
| NER | Named-entity recognition | batch_69a250e401288190ba12322c9c5f07c9 |
completed | Feb. 28, 2026, 2:20 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69a2554a9e70819099ab14df3da5e403 |
completed | Feb. 28, 2026, 2:39 a.m. |
| PD | Predicate disambiguation | batch_69a24e9f40908190a2f4a2111469b733 |
completed | Feb. 28, 2026, 2:10 a.m. |
Created at: Feb. 28, 2026, 1:55 a.m.