Triple
T5935519
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | JR East urban network |
E132032
|
entity |
| Predicate | hasLine |
P35
|
FINISHED |
| Object | Chūō Line Rapid |
E680414
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Chūō Line Rapid | Statement: [JR East urban network, hasLine, Chūō Line Rapid]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Chūō Line Rapid Context triple: [JR East urban network, hasLine, Chūō Line Rapid]
-
A.
Chūō Line (Rapid)
chosen
The Chūō Line (Rapid) is a major high-speed commuter rail service in Tokyo that connects central Tokyo with its western suburbs and is operated by JR East.
-
B.
Chuo Line
The Chuo Line is a major rapid transit line in the Osaka Metro system that runs east–west through central Osaka, connecting key commercial and residential districts.
-
C.
Tōzai Line
The Tōzai Line is an east–west rapid transit line forming part of the Kyoto Municipal Subway system in Kyoto, Japan.
-
D.
JR Chuo-Sobu Line
The JR Chuo-Sobu Line is a major local railway line in Tokyo and surrounding areas operated by JR East, connecting central city districts and numerous commuter neighborhoods.
-
E.
JR Yamanote Line
The JR Yamanote Line is a busy circular railway loop in central Tokyo that connects many of the city’s major urban hubs and transit interchanges.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0085c55dc8190aa90e242c956e2fa |
completed | March 22, 2026, 3:18 p.m. |
| NER | Named-entity recognition | batch_69c038eb56ec81909be03509730b7cc1 |
completed | March 22, 2026, 6:46 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c8c7a4eddc81908148e3428c69d654 |
completed | March 29, 2026, 6:33 a.m. |
Created at: March 22, 2026, 4:01 p.m.