Triple
T5932382
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ICH Q8 Pharmaceutical Development |
E131967
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ICH quality guideline |
C989
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ICH quality guideline Context triple: [ICH Q8 Pharmaceutical Development, instanceOf, ICH quality guideline]
-
A.
ISO guide
An ISO guide is a standardized document that provides principles, recommendations, or procedures to support the consistent development, implementation, and interpretation of International Organization for Standardization (ISO) standards.
-
B.
IEC Conformity Assessment System
The IEC Conformity Assessment System is a structured framework of international schemes and procedures used to evaluate and certify that electrical, electronic, and related technologies comply with IEC standards.
-
C.
normative guideline
chosen
A normative guideline is a prescriptive rule or principle that defines how things ought to be done or how people ought to behave within a particular context or system.
-
D.
ICT standard
An ICT standard is an agreed set of technical specifications and guidelines that ensure interoperability, compatibility, security, and quality for information and communication technology products and services.
-
E.
IEC system for conformity testing and certification
An IEC system for conformity testing and certification is a standardized framework that defines procedures, criteria, and accreditation mechanisms to verify and certify that products, services, or systems comply with relevant IEC international standards.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0085b75e88190a632f9691f9da48b |
completed | March 22, 2026, 3:18 p.m. |
Created at: March 22, 2026, 4 p.m.