Triple

T592818
Position Surface form Disambiguated ID Type / Status
Subject M25 motorway E17312 entity
Predicate hasJunctionWith P1018 FINISHED
Object A30 road E22254 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A30 road | Statement: [M25 motorway, hasJunctionWith, A30 road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A30 road
Context triple: [M25 motorway, hasJunctionWith, A30 road]
  • A. A30 road chosen
    The A30 road is a major trunk route in southern England that runs from London through counties including Surrey toward the southwest.
  • B. A34 road
    The A34 road is a major trunk route in England running from Winchester in Hampshire to Salford near Manchester, serving as a key north–south link and bypassing cities such as Oxford and Newbury.
  • C. A31 road
    The A31 road is a major route in southern England that connects Guildford in Surrey to Dorset, forming part of an important east–west corridor between London and the south coast.
  • D. A13 road
    The A13 road is a major east–west route in southern England connecting central London with the Thames Gateway and Essex.
  • E. A3 road
    The A3 road is a major trunk route in England that connects London to Portsmouth, passing through counties such as Surrey.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49379d09c8190ac7e00b24e2810b1 completed March 1, 2026, 7:28 p.m.
NER Named-entity recognition batch_69a49bbcaf5c81908de4e27096d3da13 completed March 1, 2026, 8:04 p.m.
NED1 Entity disambiguation (via context triple) batch_69ac1185da8c8190a70f4fd885bbe209 completed March 7, 2026, 11:52 a.m.
Created at: March 1, 2026, 7:33 p.m.