Triple
T591359
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Camp X |
E17277
|
entity |
| Predicate | alsoKnownAs |
P39
|
FINISHED |
| Object | STS 103 |
E48389
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS 103 | Statement: [Camp X, alsoKnownAs, STS 103]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: STS 103 Context triple: [Camp X, alsoKnownAs, STS 103]
-
A.
STS-103
chosen
STS-103 was a NASA Space Shuttle Discovery mission in 1999 dedicated to repairing and upgrading the Hubble Space Telescope to extend its operational life and scientific capabilities.
-
B.
STS-109
STS-109 was a NASA Space Shuttle Columbia mission in 2002 that upgraded and refurbished the Hubble Space Telescope, significantly enhancing its scientific capabilities.
-
C.
STS-135
STS-135 was the final mission of NASA’s Space Shuttle program, flown by Atlantis in 2011 to resupply the International Space Station and conclude the shuttle era.
-
D.
STS-31
STS-31 was a 1990 NASA Space Shuttle Discovery mission best known for deploying the Hubble Space Telescope into low Earth orbit.
-
E.
STS-125
STS-125 was NASA’s final Space Shuttle servicing mission to upgrade and repair the Hubble Space Telescope, extending its scientific capabilities and operational life.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a49379d09c8190ac7e00b24e2810b1 |
completed | March 1, 2026, 7:28 p.m. |
| NER | Named-entity recognition | batch_69a49bbaf53081908eed240bed09f63b |
completed | March 1, 2026, 8:04 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69a51554857481909c684b86b51aa126 |
completed | March 2, 2026, 4:43 a.m. |
Created at: March 1, 2026, 7:33 p.m.