Triple

T5870753
Position Surface form Disambiguated ID Type / Status
Subject Stanley Matthews E130508 entity
Predicate endTimeOfProfessionalCareer P39575 FINISHED
Object 1965 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1965 | Statement: [Stanley Matthews, endTimeOfProfessionalCareer, 1965]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: endTimeOfProfessionalCareer
Context triple: [Stanley Matthews, endTimeOfProfessionalCareer, 1965]
  • A. activeYearsEndTime
    Indicates the point in time when an entity’s period of activity or operation comes to an end.
  • B. seniorCareerEnd chosen
    Indicates the point in time or event at which an entity’s senior-level career or professional activity comes to an end.
  • C. activeYearsInCareer
    Indicates the span of time during which an entity was actively engaged in a particular career or professional field.
  • D. managerialCareerEnd
    Indicates the point in time or event at which an individual's managerial career comes to an end.
  • E. spentEntireCareerWith
    Indicates that an individual has worked exclusively for a single organization or team for the full duration of their professional career.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0085047dc8190af24e311edad3c07 completed March 22, 2026, 3:18 p.m.
NER Named-entity recognition batch_69c044ffaef081909faaa7f420a3b9b7 completed March 22, 2026, 7:37 p.m.
PD Predicate disambiguation batch_69c03347e51c81909053bcf34e3b88ab completed March 22, 2026, 6:22 p.m.
Created at: March 22, 2026, 3:56 p.m.