Triple

T585102
Position Surface form Disambiguated ID Type / Status
Subject Jamaica Station E15140 entity
Predicate instanceOf P0 FINISHED
Object AirTrain JFK station C463 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: AirTrain JFK station
Context triple: [Jamaica Station, instanceOf, AirTrain JFK station]
  • A. rapid transit station chosen
    A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
  • B. port authority
    A port authority is an organization responsible for managing, regulating, and developing a seaport or group of ports, including their infrastructure, operations, and related maritime activities.
  • C. light-rail station
    A light-rail station is a designated facility where light-rail vehicles stop to allow passengers to board, alight, and transfer between services, typically featuring platforms, shelters, signage, and ticketing amenities.
  • D. commuter rail station
    A commuter rail station is a designated facility where passengers board and alight regional trains that connect suburbs or outlying areas with urban centers, typically offering platforms, ticketing, and basic passenger amenities.
  • E. MBTA Commuter Rail station
    An MBTA Commuter Rail station is a designated passenger facility along the Massachusetts Bay Transportation Authority’s regional rail network where trains stop to allow riders to board, alight, and connect with other modes of transit.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4935783b8819082b77726ec10cc42 completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:33 p.m.