Triple
T5843553
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Parbati River |
E129650
|
entity |
| Predicate | hasHydropowerProject |
P15311
|
FINISHED |
| Object |
Parbati Hydroelectric Project
The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
|
E549913
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Parbati Hydroelectric Project | Statement: [Parbati River, hasHydropowerProject, Parbati Hydroelectric Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Parbati Hydroelectric Project Context triple: [Parbati River, hasHydropowerProject, Parbati Hydroelectric Project]
-
A.
Indravati Hydroelectric Project
Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
-
B.
Teesta V Hydroelectric Project
Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
-
C.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
D.
Kishanganga Hydroelectric Plant
The Kishanganga Hydroelectric Plant is a run-of-the-river hydroelectric power station in Jammu and Kashmir, India, built on a tributary of the Jhelum to generate electricity and support regional water management.
-
E.
Ujh Multipurpose Project
The Ujh Multipurpose Project is a planned Indian infrastructure scheme aimed at harnessing the waters of the Ujh River for irrigation, drinking water supply, and hydroelectric power generation.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Parbati Hydroelectric Project Triple: [Parbati River, hasHydropowerProject, Parbati Hydroelectric Project]
Generated description
The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Parbati Hydroelectric Project Target entity description: The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
-
A.
Indravati Hydroelectric Project
Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
-
B.
Teesta V Hydroelectric Project
Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
-
C.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
D.
Kishanganga Hydroelectric Plant
The Kishanganga Hydroelectric Plant is a run-of-the-river hydroelectric power station in Jammu and Kashmir, India, built on a tributary of the Jhelum to generate electricity and support regional water management.
-
E.
Ujh Multipurpose Project
The Ujh Multipurpose Project is a planned Indian infrastructure scheme aimed at harnessing the waters of the Ujh River for irrigation, drinking water supply, and hydroelectric power generation.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0084bd31c8190a796bb6284845e83 |
completed | March 22, 2026, 3:18 p.m. |
| NER | Named-entity recognition | batch_69c034d9da0c8190970319d0dc2fc73f |
completed | March 22, 2026, 6:28 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c0a1a6587c8190b76b1005178c29a9 |
completed | March 23, 2026, 2:12 a.m. |
| NEDg | Description generation | batch_69c0a2bd6cdc819096c6829dc8d5d61e |
completed | March 23, 2026, 2:17 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69c0a323d9248190aa803c27be3d5eec |
completed | March 23, 2026, 2:19 a.m. |
Created at: March 22, 2026, 3:54 p.m.