Triple

T5843553
Position Surface form Disambiguated ID Type / Status
Subject Parbati River E129650 entity
Predicate hasHydropowerProject P15311 FINISHED
Object Parbati Hydroelectric Project
The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
E549913 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Parbati Hydroelectric Project | Statement: [Parbati River, hasHydropowerProject, Parbati Hydroelectric Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Parbati Hydroelectric Project
Context triple: [Parbati River, hasHydropowerProject, Parbati Hydroelectric Project]
  • A. Indravati Hydroelectric Project
    Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
  • B. Teesta V Hydroelectric Project
    Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
  • C. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • D. Kishanganga Hydroelectric Plant
    The Kishanganga Hydroelectric Plant is a run-of-the-river hydroelectric power station in Jammu and Kashmir, India, built on a tributary of the Jhelum to generate electricity and support regional water management.
  • E. Ujh Multipurpose Project
    The Ujh Multipurpose Project is a planned Indian infrastructure scheme aimed at harnessing the waters of the Ujh River for irrigation, drinking water supply, and hydroelectric power generation.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Parbati Hydroelectric Project
Triple: [Parbati River, hasHydropowerProject, Parbati Hydroelectric Project]
Generated description
The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Parbati Hydroelectric Project
Target entity description: The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
  • A. Indravati Hydroelectric Project
    Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
  • B. Teesta V Hydroelectric Project
    Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
  • C. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • D. Kishanganga Hydroelectric Plant
    The Kishanganga Hydroelectric Plant is a run-of-the-river hydroelectric power station in Jammu and Kashmir, India, built on a tributary of the Jhelum to generate electricity and support regional water management.
  • E. Ujh Multipurpose Project
    The Ujh Multipurpose Project is a planned Indian infrastructure scheme aimed at harnessing the waters of the Ujh River for irrigation, drinking water supply, and hydroelectric power generation.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0084bd31c8190a796bb6284845e83 completed March 22, 2026, 3:18 p.m.
NER Named-entity recognition batch_69c034d9da0c8190970319d0dc2fc73f completed March 22, 2026, 6:28 p.m.
NED1 Entity disambiguation (via context triple) batch_69c0a1a6587c8190b76b1005178c29a9 completed March 23, 2026, 2:12 a.m.
NEDg Description generation batch_69c0a2bd6cdc819096c6829dc8d5d61e completed March 23, 2026, 2:17 a.m.
NED2 Entity disambiguation (via description) batch_69c0a323d9248190aa803c27be3d5eec completed March 23, 2026, 2:19 a.m.
Created at: March 22, 2026, 3:54 p.m.