Triple

T5838558
Position Surface form Disambiguated ID Type / Status
Subject Baťa company town E129535 entity
Predicate instanceOf P0 FINISHED
Object planned industrial town C4144 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned industrial town
Context triple: [Baťa company town, instanceOf, planned industrial town]
  • A. industrial town chosen
    An industrial town is a settlement whose economy and landscape are dominated by factories, warehouses, and related infrastructure supporting manufacturing and heavy industry.
  • B. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • C. former industrial town
    A former industrial town is a community whose economy and identity were once dominated by manufacturing or heavy industry but have since declined or transitioned to other forms of economic activity.
  • D. planned residential community
    A planned residential community is a deliberately designed neighborhood or development where housing, infrastructure, amenities, and land use are pre-organized to create a cohesive living environment.
  • E. industrial center
    An industrial center is a concentrated area where manufacturing, production, and related economic activities are clustered, supported by specialized infrastructure and labor.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0084af79c81908af128ccc29983d0 completed March 22, 2026, 3:18 p.m.
Created at: March 22, 2026, 3:54 p.m.