Triple

T581078
Position Surface form Disambiguated ID Type / Status
Subject Paris airport system E15058 entity
Predicate instanceOf P0 FINISHED
Object transport infrastructure network C4130 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transport infrastructure network
Context triple: [Paris airport system, instanceOf, transport infrastructure network]
  • A. road network
    A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
  • B. railway network
    A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
  • C. road infrastructure
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • D. transport corridor
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • E. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4935783b8819082b77726ec10cc42 completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:33 p.m.