Triple
T57959
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Navy Pier |
E1147
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | pier |
C453
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: pier Context triple: [Navy Pier, instanceOf, pier]
-
A.
pond
A pond is a small, often still body of water, natural or artificial, that supports aquatic life and reflects its surrounding environment.
-
B.
seaport
A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
-
C.
peninsula
A peninsula is a landform surrounded by water on most of its border while remaining connected to a larger landmass by an isthmus or broad base.
-
D.
public square
A public square is an open, communal urban space where people gather for social interaction, events, commerce, and civic activities.
-
E.
harbor
chosen
A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a248adc5b48190aa8db9fb092fb28a |
completed | Feb. 28, 2026, 1:45 a.m. |
Created at: Feb. 28, 2026, 1:50 a.m.