Triple

T57959
Position Surface form Disambiguated ID Type / Status
Subject Navy Pier E1147 entity
Predicate instanceOf P0 FINISHED
Object pier C453 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pier
Context triple: [Navy Pier, instanceOf, pier]
  • A. pond
    A pond is a small, often still body of water, natural or artificial, that supports aquatic life and reflects its surrounding environment.
  • B. seaport
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • C. peninsula
    A peninsula is a landform surrounded by water on most of its border while remaining connected to a larger landmass by an isthmus or broad base.
  • D. public square
    A public square is an open, communal urban space where people gather for social interaction, events, commerce, and civic activities.
  • E. harbor chosen
    A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a248adc5b48190aa8db9fb092fb28a completed Feb. 28, 2026, 1:45 a.m.
Created at: Feb. 28, 2026, 1:50 a.m.