Triple

T5786802
Position Surface form Disambiguated ID Type / Status
Subject Ultra Low Emission Zone E128286 entity
Predicate furtherExpansionDate P12553 FINISHED
Object 2023-08-29 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2023-08-29 | Statement: [Ultra Low Emission Zone, furtherExpansionDate, 2023-08-29]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: furtherExpansionDate
Context triple: [Ultra Low Emission Zone, furtherExpansionDate, 2023-08-29]
  • A. significantExpansionDate
    Indicates the date on which an entity underwent a major or notable expansion in its size, scope, or operations.
  • B. estimatedInitialExpansionDate
    Indicates the date on which the initial expansion of something (such as a project, system, or operation) is estimated to have begun or will begin.
  • C. extensionEffectiveDate
    Indicates the date on which an extension to an existing agreement, term, or condition becomes effective.
  • D. plannedExtensionTo
    Indicates that one entity is intended or scheduled to be extended, expanded, or continued by another entity in the future.
  • E. expansionOpeningDate chosen
    Indicates the date on which an expansion of something (such as a facility, service, or project) was officially opened or became operational.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0084450048190bc647b649a05136b completed March 22, 2026, 3:18 p.m.
NER Named-entity recognition batch_69c02a1c29d48190af36cc855bb491dd completed March 22, 2026, 5:42 p.m.
PD Predicate disambiguation batch_69c021d2cd608190b98a7e3aa7001d27 completed March 22, 2026, 5:07 p.m.
Created at: March 22, 2026, 3:51 p.m.