Triple

T5786592
Position Surface form Disambiguated ID Type / Status
Subject Emirates Air Line cable car E128282 entity
Predicate instanceOf P0 FINISHED
Object urban gondola lift C1080 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban gondola lift
Context triple: [Emirates Air Line cable car, instanceOf, urban gondola lift]
  • A. cable car station
    A cable car station is a designated facility where passengers board, disembark, and transfer between cable-propelled vehicles, typically featuring platforms, ticketing areas, and equipment for operating and maintaining the cable system.
  • B. cable car system chosen
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • C. elevator
    An elevator is a vertically moving transport device within a building that carries people or goods between different floors using a guided platform and mechanical lifting system.
  • D. Ferris wheel
    A Ferris wheel is a large, rotating upright wheel with passenger cabins attached to its rim, providing riders with elevated, circular views of the surrounding area.
  • E. people mover system
    A people mover system is an automated transportation network designed to efficiently move passengers over short to medium distances within confined areas such as airports, campuses, or urban centers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0084450048190bc647b649a05136b completed March 22, 2026, 3:18 p.m.
Created at: March 22, 2026, 3:51 p.m.