Triple
T578057
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Network Manager Operations Centre |
E14999
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Eurocontrol facility |
C3808
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Eurocontrol facility Context triple: [Network Manager Operations Centre, instanceOf, Eurocontrol facility]
-
A.
air navigation organization
chosen
An air navigation organization is an entity responsible for planning, managing, and controlling the safe and efficient movement of aircraft through designated airspace using air traffic services, communication, navigation, and surveillance systems.
-
B.
airport authority
An airport authority is an organization responsible for the ownership, management, operation, and regulation of an airport or group of airports, ensuring safe, efficient, and compliant aviation services and facilities.
-
C.
aviation authority
An aviation authority is a governmental or regulatory body responsible for overseeing civil aviation safety, security, standards, and compliance within a specific jurisdiction.
-
D.
flight simulation facility
A flight simulation facility is a specialized environment equipped with advanced simulators and support systems that replicate real-world aircraft operations for pilot training, research, and systems testing.
-
E.
public airport
A public airport is a government- or publicly-owned aviation facility open for use by the general public, providing infrastructure and services for commercial, private, and cargo air transportation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4935783b8819082b77726ec10cc42 |
completed | March 1, 2026, 7:28 p.m. |
Created at: March 1, 2026, 7:33 p.m.