Triple

T578055
Position Surface form Disambiguated ID Type / Status
Subject Network Manager Operations Centre E14999 entity
Predicate instanceOf P0 FINISHED
Object air traffic management facility C3808 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: air traffic management facility
Context triple: [Network Manager Operations Centre, instanceOf, air traffic management facility]
  • A. air navigation organization chosen
    An air navigation organization is an entity responsible for planning, managing, and controlling the safe and efficient movement of aircraft through designated airspace using air traffic services, communication, navigation, and surveillance systems.
  • B. airport authority
    An airport authority is an organization responsible for the ownership, management, operation, and regulation of an airport or group of airports, ensuring safe, efficient, and compliant aviation services and facilities.
  • C. airfield
    An airfield is a designated area of land equipped with runways, taxiways, and minimal support facilities for the takeoff, landing, and ground movement of aircraft.
  • D. aviation authority
    An aviation authority is a governmental or regulatory body responsible for overseeing civil aviation safety, security, standards, and compliance within a specific jurisdiction.
  • E. airport runway
    An airport runway is a long, specially prepared strip of land or pavement where aircraft take off and land, designed with specific markings, lighting, and surface strength to ensure safe operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4935783b8819082b77726ec10cc42 completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:33 p.m.