Triple

T5774164
Position Surface form Disambiguated ID Type / Status
Subject Tagus Basin E127397 entity
Predicate hasInfrastructure P2560 FINISHED
Object Pracana Dam
Pracana Dam is a hydroelectric and water management dam located on the Ocreza River in central Portugal, contributing to the regulation and use of resources in the Tagus River basin.
E554479 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pracana Dam | Statement: [Tagus Basin, hasInfrastructure, Pracana Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pracana Dam
Context triple: [Tagus Basin, hasInfrastructure, Pracana Dam]
  • A. Wlingi Dam
    Wlingi Dam is a hydroelectric and irrigation dam located on the Brantas River in East Java, Indonesia.
  • B. Wayatinah Dam
    Wayatinah Dam is a hydroelectric dam on Tasmania’s Derwent River that forms part of the state’s major power generation scheme.
  • C. Pantabangan Dam
    Pantabangan Dam is a major multi-purpose dam in the Philippines known for irrigation, flood control, and hydroelectric power generation in Central Luzon.
  • D. Jirau Dam
    Jirau Dam is a large hydroelectric power plant in Brazil, built on the Madeira River as part of the country’s major Amazon basin energy infrastructure.
  • E. Mula Dam
    Mula Dam is a major irrigation and water-supply dam built on the Mula River in Maharashtra, India.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Pracana Dam
Triple: [Tagus Basin, hasInfrastructure, Pracana Dam]
Generated description
Pracana Dam is a hydroelectric and water management dam located on the Ocreza River in central Portugal, contributing to the regulation and use of resources in the Tagus River basin.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Pracana Dam
Target entity description: Pracana Dam is a hydroelectric and water management dam located on the Ocreza River in central Portugal, contributing to the regulation and use of resources in the Tagus River basin.
  • A. Wlingi Dam
    Wlingi Dam is a hydroelectric and irrigation dam located on the Brantas River in East Java, Indonesia.
  • B. Wayatinah Dam
    Wayatinah Dam is a hydroelectric dam on Tasmania’s Derwent River that forms part of the state’s major power generation scheme.
  • C. Pantabangan Dam
    Pantabangan Dam is a major multi-purpose dam in the Philippines known for irrigation, flood control, and hydroelectric power generation in Central Luzon.
  • D. Jirau Dam
    Jirau Dam is a large hydroelectric power plant in Brazil, built on the Madeira River as part of the country’s major Amazon basin energy infrastructure.
  • E. Mula Dam
    Mula Dam is a major irrigation and water-supply dam built on the Mula River in Maharashtra, India.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008361fa88190aefa4dc41b051e7f completed March 22, 2026, 3:18 p.m.
NER Named-entity recognition batch_69c029b0aa1c8190bf513212cfead33c completed March 22, 2026, 5:41 p.m.
NED1 Entity disambiguation (via context triple) batch_69c0b0cbc4188190b40cf403e43411fa completed March 23, 2026, 3:17 a.m.
NEDg Description generation batch_69c0b5067a08819099ef4caf08ca6f33 completed March 23, 2026, 3:35 a.m.
NED2 Entity disambiguation (via description) batch_69c0b55a971c819091aaf9817776a826 completed March 23, 2026, 3:36 a.m.
Created at: March 22, 2026, 3:50 p.m.