Triple

T5761193
Position Surface form Disambiguated ID Type / Status
Subject SR 400 Express Lanes E127097 entity
Predicate instanceOf P0 FINISHED
Object managed lanes project C5921 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: managed lanes project
Context triple: [SR 400 Express Lanes, instanceOf, managed lanes project]
  • A. high-occupancy toll lanes chosen
    High-occupancy toll lanes are special highway lanes that allow vehicles with multiple occupants to travel for free or at reduced cost while single-occupant vehicles can use them by paying a variable toll designed to manage congestion and maintain faster traffic flow.
  • B. public transit and highway improvement program
    A public transit and highway improvement program is a coordinated set of projects and policies designed to enhance the capacity, safety, efficiency, and accessibility of transportation networks through upgrades to roads, highways, and mass transit systems.
  • C. controlled-access highway
    A controlled-access highway is a high-speed road designed for uninterrupted traffic flow, featuring limited entry and exit points via ramps, no at-grade intersections, and restrictions on pedestrian and non-motorized access.
  • D. road infrastructure
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • E. highway segment
    A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00833a3fc81908f4bc29ed011b7a6 completed March 22, 2026, 3:18 p.m.
Created at: March 22, 2026, 3:49 p.m.