Triple
T5756579
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Royal Navy shore establishments |
E126982
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Royal Navy infrastructure component |
C6908
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Royal Navy infrastructure component Context triple: [Royal Navy shore establishments, instanceOf, Royal Navy infrastructure component]
-
A.
Royal Navy operational command
A Royal Navy operational command is an organizational unit responsible for planning, directing, and controlling naval forces and operations within a defined area or functional domain.
-
B.
Royal Navy warship
A Royal Navy warship is a commissioned naval vessel of the United Kingdom designed, armed, and operated for maritime defense, power projection, and support of national interests at sea.
-
C.
Royal Navy station
chosen
A Royal Navy station is a geographically defined area or shore establishment from which Royal Navy forces are administered, supported, and directed for operations within a particular region.
-
D.
Royal Navy destroyer
A Royal Navy destroyer is a fast, maneuverable warship designed for fleet escort, anti-submarine, anti-air, and surface warfare operations within the United Kingdom’s naval forces.
-
E.
Royal Navy training ship
A Royal Navy training ship is a vessel designated for the instruction and practical seamanship training of naval recruits, officer cadets, and specialist personnel.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c00833a3fc81908f4bc29ed011b7a6 |
completed | March 22, 2026, 3:18 p.m. |
Created at: March 22, 2026, 3:49 p.m.