Triple

T573283
Position Surface form Disambiguated ID Type / Status
Subject Osaka Metro E13707 entity
Predicate hasPart P35 FINISHED
Object New Tram
New Tram is an automated guideway transit line in Osaka, Japan, operated as part of the Osaka Metro system.
E71899 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: New Tram | Statement: [Osaka Metro, hasPart, New Tram]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: New Tram
Context triple: [Osaka Metro, hasPart, New Tram]
  • A. MAX Light Rail
    MAX Light Rail is the metropolitan light rail transit system serving the Portland, Oregon, metropolitan area.
  • B. M5000 tram
    The M5000 tram is a modern light-rail vehicle used across the Manchester Metrolink network as its primary fleet for urban passenger services.
  • C. O-Train
    The O-Train is Ottawa’s urban rail transit system, providing light rail service across key corridors of Canada’s capital city.
  • D. Edinburgh Trams
    Edinburgh Trams is a modern light rail system in Edinburgh, Scotland, providing urban and suburban passenger transport across the city.
  • E. DART Light Rail
    DART Light Rail is a light rail transit system serving the Dallas–Fort Worth metropolitan area, operated by Dallas Area Rapid Transit.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: New Tram
Triple: [Osaka Metro, hasPart, New Tram]
Generated description
New Tram is an automated guideway transit line in Osaka, Japan, operated as part of the Osaka Metro system.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: New Tram
Target entity description: New Tram is an automated guideway transit line in Osaka, Japan, operated as part of the Osaka Metro system.
  • A. MAX Light Rail
    MAX Light Rail is the metropolitan light rail transit system serving the Portland, Oregon, metropolitan area.
  • B. M5000 tram
    The M5000 tram is a modern light-rail vehicle used across the Manchester Metrolink network as its primary fleet for urban passenger services.
  • C. O-Train
    The O-Train is Ottawa’s urban rail transit system, providing light rail service across key corridors of Canada’s capital city.
  • D. Edinburgh Trams
    Edinburgh Trams is a modern light rail system in Edinburgh, Scotland, providing urban and suburban passenger transport across the city.
  • E. DART Light Rail
    DART Light Rail is a light rail transit system serving the Dallas–Fort Worth metropolitan area, operated by Dallas Area Rapid Transit.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4933fa4d88190a7949cc83c08c5c1 completed March 1, 2026, 7:27 p.m.
NER Named-entity recognition batch_69a49b4ae0988190bdd0ad428b784d85 completed March 1, 2026, 8:02 p.m.
NED1 Entity disambiguation (via context triple) batch_69a4ff4c3df48190a886a8d3c633d417 completed March 2, 2026, 3:09 a.m.
NEDg Description generation batch_69a4ffcad6e08190938018ade5bc5d67 completed March 2, 2026, 3:11 a.m.
NED2 Entity disambiguation (via description) batch_69a5001de9c481909d43c001028c922c completed March 2, 2026, 3:12 a.m.
Created at: March 1, 2026, 7:33 p.m.