Triple

T5708474
Position Surface form Disambiguated ID Type / Status
Subject Agilkia Island E125843 entity
Predicate nearbyStructure P2064 FINISHED
Object Old Aswan Dam E288243 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Old Aswan Dam | Statement: [Agilkia Island, nearbyStructure, Old Aswan Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Old Aswan Dam
Context triple: [Agilkia Island, nearbyStructure, Old Aswan Dam]
  • A. Aswan Low Dam chosen
    The Aswan Low Dam is an earlier masonry gravity dam on the Nile River in Egypt, built by the British at the start of the 20th century to control flooding and support irrigation before the construction of the Aswan High Dam.
  • B. Aswan High Dam
    The Aswan High Dam is a massive embankment dam on the Nile River in southern Egypt, built in the 1960s to control flooding, provide hydroelectric power, and improve irrigation, while also causing the creation of Lake Nasser and the displacement of communities and archaeological sites in Nubia.
  • C. Khashm el-Girba Dam
    Khashm el-Girba Dam is a major embankment dam in eastern Sudan that provides irrigation water, hydroelectric power, and flood control along the Atbara River.
  • D. Assiut Barrage on the Nile
    The Assiut Barrage on the Nile is a major irrigation and water-control structure in Upper Egypt that regulates river flow and supports agriculture around the city of Assiut.
  • E. Upper Atbara and Setit Dam Complex
    The Upper Atbara and Setit Dam Complex is a major hydropower and irrigation infrastructure project in eastern Sudan that harnesses the waters of the Atbara and Setit rivers to generate electricity, support agriculture, and regulate water flow.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0082d6fe48190b777fb383769e5c8 completed March 22, 2026, 3:18 p.m.
NER Named-entity recognition batch_69c0248ab6a88190be17bdc32c36e5cb completed March 22, 2026, 5:19 p.m.
NED1 Entity disambiguation (via context triple) batch_69c07de7df8c8190824d24f729eaa04d completed March 22, 2026, 11:40 p.m.
Created at: March 22, 2026, 3:46 p.m.