Triple
T5702016
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ShopVille |
E125686
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | underground shopping center |
C1524
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: underground shopping center Context triple: [ShopVille, instanceOf, underground shopping center]
-
A.
shopping centre
chosen
A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
-
B.
shopping mall
A shopping mall is a large, often enclosed commercial complex that houses multiple retail stores, dining options, and services connected by shared walkways and common areas.
-
C.
shopping area
A shopping area is a designated space, such as a street, district, or complex, where multiple retail stores and related services are concentrated for consumer purchasing and leisure activities.
-
D.
underground structure
An underground structure is a man-made construction built below the earth’s surface to provide space, protection, or support for various human activities or infrastructure.
-
E.
urban plaza
An urban plaza is a publicly accessible open space within a city, typically surrounded by buildings and streets, designed to support social interaction, circulation, and civic activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0082c96988190b3a6a201edce472a |
completed | March 22, 2026, 3:18 p.m. |
Created at: March 22, 2026, 3:45 p.m.