Triple

T5652474
Position Surface form Disambiguated ID Type / Status
Subject Norwegian railway network E124536 entity
Predicate majorLine P41814 FINISHED
Object Østfold Line E50820 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Østfold Line | Statement: [Norwegian railway network, majorLine, Østfold Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Østfold Line
Context triple: [Norwegian railway network, majorLine, Østfold Line]
  • A. Østfold Line chosen
    The Østfold Line is a major railway line in southeastern Norway that runs from Oslo through towns in the Østfold region toward the Swedish border.
  • B. Drammen Line
    The Drammen Line is a major Norwegian railway route connecting Oslo with the city of Drammen and serving as an important commuter and intercity corridor in the Oslo region.
  • C. Arendal Line
    The Arendal Line is a Norwegian railway route that connects the coastal town of Arendal to the national rail network.
  • D. Numedal Line
    The Numedal Line is a Norwegian railway route running through the Numedal valley, historically used for passenger and freight transport and now partly operated as a heritage and tourist line.
  • E. Frederiksværk Line
    The Frederiksværk Line is a Danish regional railway line in North Zealand that connects several towns between Hillerød and Hundested.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00825df388190a58742fa9b1aa33d completed March 22, 2026, 3:17 p.m.
NER Named-entity recognition batch_69c022d8a2588190b10de59edbc8841f completed March 22, 2026, 5:11 p.m.
NED1 Entity disambiguation (via context triple) batch_69c04d941ea4819084bab644d6cc2153 completed March 22, 2026, 8:14 p.m.
Created at: March 22, 2026, 3:42 p.m.