Triple
T5638033
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | PATH underground walkway system |
E124196
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | shopping concourse system |
C1524
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: shopping concourse system Context triple: [PATH underground walkway system, instanceOf, shopping concourse system]
-
A.
shopping mall
A shopping mall is a large, often enclosed commercial complex that houses multiple retail stores, dining options, and services connected by shared walkways and common areas.
-
B.
shopping area
A shopping area is a designated space, such as a street, district, or complex, where multiple retail stores and related services are concentrated for consumer purchasing and leisure activities.
-
C.
streetcar system
A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
-
D.
shopping centre
chosen
A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
-
E.
commerce route
A commerce route is a regularly used path or network connecting locations for the transport and exchange of goods, services, and economic value.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c00824643c81909ffdb888a2d35189 |
completed | March 22, 2026, 3:17 p.m. |
Created at: March 22, 2026, 3:41 p.m.