Triple

T5627696
Position Surface form Disambiguated ID Type / Status
Subject ICP (Initial Connection Protocol) E147759 entity
Predicate abbreviation P43 FINISHED
Object ICP E147759 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ICP | Statement: [ICP (Initial Connection Protocol), abbreviation, ICP]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: ICP
Context triple: [ICP (Initial Connection Protocol), abbreviation, ICP]
  • A. ICP chosen
    ICP (Initial Connection Protocol) was an early ARPANET protocol used to establish and negotiate initial connections between hosts before handing communication over to higher-level services.
  • B. IC
    IC is a category of long-distance passenger trains in Poland, operated by PKP Intercity and offering intercity connections between major cities.
  • C. IC
    IC is a common abbreviation for Iowa City, a university-centered community best known as the home of the University of Iowa and its renowned Writers' Workshop.
  • D. IC
    IC was the stock ticker symbol used by the historic Illinois Central Railroad, a major U.S. railroad that played a key role in Midwestern and Southern rail transport.
  • E. IP
    IP is the acronym for Infraestruturas de Portugal, the Portuguese state-owned company responsible for managing the country’s road and rail infrastructure.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00906f2a88190a992c66b13d606d4 completed March 22, 2026, 3:21 p.m.
NER Named-entity recognition batch_69c02239500c8190ad3035e44c3b0670 completed March 22, 2026, 5:09 p.m.
NED1 Entity disambiguation (via context triple) batch_69c04d654c6c819087c1bcb4eb9530d0 completed March 22, 2026, 8:13 p.m.
Created at: March 22, 2026, 3:40 p.m.