Triple

T5624162
Position Surface form Disambiguated ID Type / Status
Subject Fryingpan–Arkansas Project E147679 entity
Predicate instanceOf P0 FINISHED
Object federal water resources project C2937 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: federal water resources project
Context triple: [Fryingpan–Arkansas Project, instanceOf, federal water resources project]
  • A. water resources development act
    The Water Resources Development Act is a recurring United States federal law that authorizes and guides the planning, construction, and maintenance of water resources projects such as navigation, flood control, and ecosystem restoration, primarily carried out by the U.S. Army Corps of Engineers.
  • B. water management project
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • C. water resources programme
    A water resources programme is an organized set of policies, projects, and management activities aimed at sustainably developing, allocating, protecting, and monitoring water resources to meet environmental, social, and economic needs.
  • D. water transfer project chosen
    A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
  • E. flood control agency
    A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00906f2a88190a992c66b13d606d4 completed March 22, 2026, 3:21 p.m.
Created at: March 22, 2026, 3:40 p.m.