Triple

T5573793
Position Surface form Disambiguated ID Type / Status
Subject La Grange Dam E146266 entity
Predicate downstreamOf P5956 FINISHED
Object Don Pedro Dam E558806 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Don Pedro Dam | Statement: [La Grange Dam, downstreamOf, Don Pedro Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Don Pedro Dam
Context triple: [La Grange Dam, downstreamOf, Don Pedro Dam]
  • A. Don Pedro Dam chosen
    Don Pedro Dam is a major embankment dam on the Tuolumne River in California, forming Don Pedro Reservoir and serving as a key source of water storage, hydroelectric power, and recreation in the region.
  • B. San Carlos Dam
    San Carlos Dam is a major concrete gravity dam in Arizona that creates San Carlos Lake and provides irrigation water, flood control, and hydroelectric power along the Gila River.
  • C. Piedra del Águila Dam
    Piedra del Águila Dam is a major hydroelectric dam in Argentine Patagonia, known for its large power-generating capacity and role in regulating the Limay River.
  • D. San Roque Dam
    San Roque Dam is one of the largest dams in the Philippines, serving as a major source of hydroelectric power, irrigation, and flood control in the Luzon region.
  • E. El Quimbo Dam
    El Quimbo Dam is a large hydroelectric dam on the Magdalena River in Colombia, built to generate power and support the country’s energy supply.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008ffed108190a084602227af6157 completed March 22, 2026, 3:21 p.m.
NER Named-entity recognition batch_69c02052dd0481909aba6863831357eb completed March 22, 2026, 5:01 p.m.
NED1 Entity disambiguation (via context triple) batch_69c107b36b3c819084d7e8fda4de74b7 completed March 23, 2026, 9:28 a.m.
Created at: March 22, 2026, 3:37 p.m.