Triple
T5571
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Project Xanadu |
E109
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | research project |
C120
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: research project Context triple: [Project Xanadu, instanceOf, research project]
-
A.
research prototype
A research prototype is an early, often experimental implementation of a concept or system created to explore feasibility, validate ideas, and gather feedback before full-scale development.
-
B.
research library
A research library is a specialized institution that collects, organizes, preserves, and provides access to scholarly resources and reference services to support advanced study and original research.
-
C.
research university
A research university is a higher education institution that prioritizes the creation of new knowledge through extensive research activities while offering a broad range of undergraduate and graduate academic programs.
-
D.
research facility
A research facility is a specialized institution equipped with laboratories, instruments, and resources where scientists and experts systematically investigate, experiment, and develop new knowledge or technologies.
-
E.
academic journal
An academic journal is a periodical publication that presents peer-reviewed scholarly research and analysis within a specific academic discipline or field.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a238d6b47881909e68288aed2fd858 |
completed | Feb. 28, 2026, 12:37 a.m. |
Created at: Feb. 28, 2026, 12:40 a.m.