Triple

T5570952
Position Surface form Disambiguated ID Type / Status
Subject Beauharnois generating station E146197 entity
Predicate maximumGeneratingCapacity P53312 FINISHED
Object about 1,900 megawatts LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: about 1,900 megawatts | Statement: [Beauharnois generating station, maximumGeneratingCapacity, about 1,900 megawatts]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: maximumGeneratingCapacity
Context triple: [Beauharnois generating station, maximumGeneratingCapacity, about 1,900 megawatts]
  • A. grossElectricalCapacity_MWe
    Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
  • B. totalElectricalCapacity_MWe chosen
    Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
  • C. netElectricalCapacity_MWe
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • D. turbineCapacity
    Indicates the power-generating capacity or rated output of a turbine.
  • E. annualCapacity
    Indicates the maximum amount of output or throughput an entity can produce or handle within a one-year period.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008ffed108190a084602227af6157 completed March 22, 2026, 3:21 p.m.
NER Named-entity recognition batch_69c020502a288190af37f9ebb88fccae completed March 22, 2026, 5:01 p.m.
PD Predicate disambiguation batch_69c01b12826c8190969a584d0f53aa44 completed March 22, 2026, 4:38 p.m.
Created at: March 22, 2026, 3:37 p.m.