Triple
T556587
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Garden city movement |
E11954
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planning philosophy |
C1000
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planning philosophy Context triple: [Garden city movement, instanceOf, planning philosophy]
-
A.
planning library
A planning library is a reusable collection of algorithms, data structures, and tools that support the creation, evaluation, and optimization of plans or schedules within software applications.
-
B.
planned city
A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
-
C.
city planner
A city planner is a professional who designs, organizes, and regulates the use of urban space to balance social, economic, environmental, and infrastructural needs for sustainable community development.
-
D.
philosophical movement
A philosophical movement is a historically and intellectually coherent trend in philosophy, characterized by shared themes, methods, and assumptions among a group of thinkers over a particular period or context.
-
E.
principle
chosen
A principle is a fundamental rule or guiding truth that shapes decisions, behavior, or understanding within a particular domain.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4932941d08190815efd422f0b4ca7 |
completed | March 1, 2026, 7:27 p.m. |
Created at: March 1, 2026, 7:32 p.m.