Triple

T5554518
Position Surface form Disambiguated ID Type / Status
Subject O'Shaughnessy Dam E145604 entity
Predicate associatedHydroelectricSystem P15311 FINISHED
Object Hetch Hetchy Power System E428593 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hetch Hetchy Power System | Statement: [O'Shaughnessy Dam, associatedHydroelectricSystem, Hetch Hetchy Power System]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Hetch Hetchy Power System
Context triple: [O'Shaughnessy Dam, associatedHydroelectricSystem, Hetch Hetchy Power System]
  • A. Hetch Hetchy Power System chosen
    The Hetch Hetchy Power System is a municipal hydroelectric power network that generates and delivers clean electricity to San Francisco and surrounding public facilities.
  • B. Pepacton Reservoir
    Pepacton Reservoir is a large man-made lake in the Catskill Mountains of New York that serves as a major component of New York City's drinking water supply system.
  • C. Devil Canyon Powerplant
    Devil Canyon Powerplant is a hydroelectric generating facility in Southern California that produces power as part of the State Water Project’s water conveyance and energy system.
  • D. Bonneville Dam
    Bonneville Dam is a major hydroelectric and navigation dam on the Columbia River in the Pacific Northwest, known for power generation, fish ladders, and its role in regional river management.
  • E. Salt River Project
    Salt River Project is a major public utility in Arizona that provides electricity and water to the Phoenix metropolitan area through a combination of power generation, transmission, and irrigation services.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: associatedHydroelectricSystem
Context triple: [O'Shaughnessy Dam, associatedHydroelectricSystem, Hetch Hetchy Power System]
  • A. hasHydroelectricProject chosen
    Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
  • B. hydroelectricStationCommissioned
    Indicates that a hydroelectric power station has been officially brought into operation or service on a specific date or in a specific context.
  • C. isHydroelectricProjectOn
    Indicates that a hydroelectric project is located on or situated along a specified water body or site.
  • D. hydroelectricStationCapacity
    Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
  • E. hasHydroelectricProjectOperator
    Indicates that a hydroelectric project is operated or managed by a specified operator entity.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008fcaf788190bafa02a1917ee73b completed March 22, 2026, 3:21 p.m.
NER Named-entity recognition batch_69c01ffaf4fc8190bf27014d21954a70 completed March 22, 2026, 4:59 p.m.
NED1 Entity disambiguation (via context triple) batch_69c04d01a9948190a033947c7c031e04 completed March 22, 2026, 8:11 p.m.
PD Predicate disambiguation batch_69c01b10bbf8819098655839c03b7832 completed March 22, 2026, 4:38 p.m.
Created at: March 22, 2026, 3:36 p.m.