Triple

T5550554
Position Surface form Disambiguated ID Type / Status
Subject Mozart Requiem E145514 entity
Predicate leftUnfinishedByComposer P18162 FINISHED
Object true LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Mozart Requiem, leftUnfinishedByComposer, true]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: leftUnfinishedByComposer
Context triple: [Mozart Requiem, leftUnfinishedByComposer, true]
  • A. hasUnfinishedEnding
    Indicates that an entity concludes in an incomplete, unresolved, or open-ended manner rather than reaching a fully finished state.
  • B. hasComposerInResidence
    Indicates that an organization or institution has officially appointed a specific composer to serve in a resident or ongoing compositional role.
  • C. unfinished chosen
    Indicates that an action, process, or state has started but has not yet been completed.
  • D. partOfComposerOeuvre
    Indicates that a musical work belongs to and is included within the overall body of compositions created by a particular composer.
  • E. partiallyCompleted
    Indicates that an action, process, or task has been started and progressed to some extent, but has not yet been fully completed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008fb879c81909f5bfa56fadc1d46 completed March 22, 2026, 3:21 p.m.
NER Named-entity recognition batch_69c01fe2aef481909944bc582c1f67a4 completed March 22, 2026, 4:59 p.m.
PD Predicate disambiguation batch_69c01b0e72f08190bf705d8fe1639401 completed March 22, 2026, 4:38 p.m.
Created at: March 22, 2026, 3:35 p.m.