Triple

T5536154
Position Surface form Disambiguated ID Type / Status
Subject SEPTA trackless trolley routes E145165 entity
Predicate infrastructureRequirement P6820 FINISHED
Object overhead catenary or trolley wire network LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: overhead catenary or trolley wire network | Statement: [SEPTA trackless trolley routes, infrastructureRequirement, overhead catenary or trolley wire network]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: infrastructureRequirement
Context triple: [SEPTA trackless trolley routes, infrastructureRequirement, overhead catenary or trolley wire network]
  • A. maintenanceRequirement
    Indicates that an entity is obligated to perform, schedule, or adhere to specific maintenance activities or conditions for another entity or system.
  • B. spaceRequirements
    Indicates the amount and type of physical or storage space needed for something to be properly placed, installed, or operated.
  • C. unitRequirement
    Indicates that one entity specifies a required quantity or unit that another entity must meet or conform to.
  • D. isPartOfInfrastructure
    Indicates that something belongs to, is included within, or functions as a component of a larger infrastructure system.
  • E. usesInfrastructure chosen
    Indicates that one entity makes use of, depends on, or operates through the infrastructure provided or managed by another entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008f9955881909bfa8348b56b4739 completed March 22, 2026, 3:21 p.m.
NER Named-entity recognition batch_69c01fb07e748190bea74bbde2d7b8ba completed March 22, 2026, 4:58 p.m.
PD Predicate disambiguation batch_69c01b0c50e48190a1b03ecd20ca440b completed March 22, 2026, 4:38 p.m.
Created at: March 22, 2026, 3:34 p.m.