Triple

T552296
Position Surface form Disambiguated ID Type / Status
Subject Western Electric E11865 entity
Predicate majorFacilityLocation P105 FINISHED
Object Cicero, Illinois E23252 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cicero, Illinois | Statement: [Western Electric, majorFacilityLocation, Cicero, Illinois]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cicero, Illinois
Context triple: [Western Electric, majorFacilityLocation, Cicero, Illinois]
  • A. Cicero, Illinois chosen
    Cicero, Illinois is a historic inner-ring suburb of Chicago known for its industrial base, dense residential neighborhoods, and significant immigrant communities.
  • B. Palatine, Illinois
    Palatine, Illinois is a suburban village northwest of Chicago known for its residential communities, schools, and access to regional transportation.
  • C. Niles, Illinois
    Niles, Illinois is a suburban village northwest of Chicago known for its residential character and landmarks like its Leaning Tower replica.
  • D. Lombard, Illinois
    Lombard, Illinois is a suburban village in the Chicago metropolitan area known for its historic Lilac Festival and residential character.
  • E. Winfield, Illinois
    Winfield, Illinois is a suburban village in the Chicago metropolitan area known for its residential character and proximity to major medical and forest preserve facilities.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: majorFacilityLocation
Context triple: [Western Electric, majorFacilityLocation, Cicero, Illinois]
  • A. plannedFacility
    Indicates that a facility is intended or scheduled to be built, established, or implemented in the future but does not yet exist or operate.
  • B. isGovernmentFacility
    Indicates that the subject entity functions as a facility owned, operated, or officially designated for use by a government or its agencies.
  • C. significantInfrastructure
    Indicates that an entity constitutes an important or critical piece of infrastructure within a system, network, or region.
  • D. regulatesFacility
    Indicates that one entity has authority to control, oversee, or set rules governing the operation or behavior of a facility.
  • E. hasNotableFacility chosen
    Indicates that an entity possesses or hosts a facility that is of particular significance, prominence, or interest.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4932941d08190815efd422f0b4ca7 completed March 1, 2026, 7:27 p.m.
NER Named-entity recognition batch_69a499047bd4819089ca8345f1b6e46c completed March 1, 2026, 7:52 p.m.
NED1 Entity disambiguation (via context triple) batch_69ac5988ace881908f2884b5172be062 completed March 7, 2026, 4:59 p.m.
PD Predicate disambiguation batch_69a494bae210819093c2e0d33a8ca51a completed March 1, 2026, 7:34 p.m.
Created at: March 1, 2026, 7:32 p.m.