Triple

T5520973
Position Surface form Disambiguated ID Type / Status
Subject Wilfred Corrigan E144805 entity
Predicate instanceOf P0 FINISHED
Object semiconductor industry executive C19153 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: semiconductor industry executive
Context triple: [Wilfred Corrigan, instanceOf, semiconductor industry executive]
  • A. semiconductor engineer
    A semiconductor engineer designs, develops, and optimizes microelectronic devices and integrated circuits by applying principles of materials science, electrical engineering, and manufacturing processes.
  • B. electronics pioneer
    An electronics pioneer is an individual who significantly advances the development, understanding, or application of electronic technologies through original inventions, theories, or systems.
  • C. telecommunications entrepreneur
    A telecommunications entrepreneur is an individual who identifies opportunities and builds businesses that develop, provide, or innovate communication networks, services, or technologies connecting people and organizations.
  • D. aerospace executive
    An aerospace executive is a high-level business leader responsible for guiding the strategic direction, operations, and financial performance of organizations involved in the design, manufacture, and support of aircraft, spacecraft, and related technologies.
  • E. semiconductor manufacturing facility
    A semiconductor manufacturing facility is a highly controlled industrial plant where raw silicon wafers are processed through complex, precise, and cleanroom-based fabrication steps to produce integrated circuits and microchips.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008f873a481909b4d9f7e2db3c37d completed March 22, 2026, 3:21 p.m.
Created at: March 22, 2026, 3:33 p.m.