Triple

T5502822
Position Surface form Disambiguated ID Type / Status
Subject Bureau of Corporations E144367 entity
Predicate notableWork P4 FINISHED
Object Report on the Concentration of Water Power E530605 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Report on the Concentration of Water Power | Statement: [Bureau of Corporations, notableWork, Report on the Concentration of Water Power]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Report on the Concentration of Water Power
Context triple: [Bureau of Corporations, notableWork, Report on the Concentration of Water Power]
  • A. Report on the Water-Power Industry chosen
    "Report on the Water-Power Industry" is an early 20th-century investigative study by the U.S. Bureau of Corporations analyzing the structure, control, and regulation of the emerging hydroelectric power sector.
  • B. Blenheim-Gilboa Pumped Storage Power Project
    Blenheim-Gilboa Pumped Storage Power Project is a large hydroelectric pumped-storage facility in New York State that stores and generates electricity by moving water between two reservoirs to help balance the power grid.
  • C. Niagara Falls AC power project
    The Niagara Falls AC power project was a pioneering late-19th-century hydroelectric installation that demonstrated the practicality of long-distance alternating current transmission and helped establish AC as the dominant standard for electric power systems.
  • D. Federal Water Power Act of 1920
    The Federal Water Power Act of 1920 was a U.S. law that established a comprehensive federal licensing and regulatory framework for hydroelectric power development on navigable waters and public lands.
  • E. Niagara River diversion reservoirs
    The Niagara River diversion reservoirs are man-made water storage basins that regulate and supply diverted Niagara River flow to the Sir Adam Beck Hydroelectric Generating Stations for power production.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008f5a2748190bce7a39aabf87a6d completed March 22, 2026, 3:21 p.m.
NER Named-entity recognition batch_69c01f0bbea48190bb6fecaee9c0b1d0 completed March 22, 2026, 4:55 p.m.
NED1 Entity disambiguation (via context triple) batch_69c059c9a99881909863a0d1b061df72 completed March 22, 2026, 9:06 p.m.
Created at: March 22, 2026, 3:32 p.m.