Triple

T5500800
Position Surface form Disambiguated ID Type / Status
Subject Rhymney Valley E144320 entity
Predicate hasRailwayLine P848 FINISHED
Object Rhymney Line E157491 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rhymney Line | Statement: [Rhymney Valley, hasRailwayLine, Rhymney Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Rhymney Line
Context triple: [Rhymney Valley, hasRailwayLine, Rhymney Line]
  • A. Rhymney Line chosen
    The Rhymney Line is a suburban railway route in South Wales that connects Cardiff with the town of Rhymney, forming part of the Valley Lines network.
  • B. Merthyr Line
    The Merthyr Line is a commuter rail route in South Wales that connects Cardiff with Merthyr Tydfil and surrounding Valleys communities.
  • C. Ebbw Vale line
    The Ebbw Vale line is a railway route in South Wales that connects Ebbw Vale with larger towns and cities, providing both commuter and regional passenger services.
  • D. Rhondda Line
    The Rhondda Line is a commuter rail route in South Wales that runs through the Rhondda Valleys, connecting local communities with larger hubs such as Pontypridd and Cardiff.
  • E. Maesteg Line
    The Maesteg Line is a commuter rail route in South Wales connecting Maesteg with larger hubs such as Cardiff via Bridgend.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008f5a2748190bce7a39aabf87a6d completed March 22, 2026, 3:21 p.m.
NER Named-entity recognition batch_69c01f08c2a4819093e772a1497c7ecc completed March 22, 2026, 4:55 p.m.
NED1 Entity disambiguation (via context triple) batch_69c04ca3e7cc8190b8092983f8db66b6 completed March 22, 2026, 8:10 p.m.
Created at: March 22, 2026, 3:32 p.m.