Triple

T5499004
Position Surface form Disambiguated ID Type / Status
Subject LHC Phase-1 upgrades E144280 entity
Predicate instanceOf P0 FINISHED
Object Large Hadron Collider upgrade phase C7210 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Large Hadron Collider upgrade phase
Context triple: [LHC Phase-1 upgrades, instanceOf, Large Hadron Collider upgrade phase]
  • A. particle accelerator upgrade project chosen
    A particle accelerator upgrade project is a coordinated engineering and scientific effort to enhance an existing accelerator’s performance, capabilities, or reliability through targeted hardware, software, and infrastructure improvements.
  • B. CERN experiment
    A CERN experiment is a large-scale, collaborative scientific investigation conducted at CERN’s particle physics facilities to study fundamental particles and forces using high-energy collisions and advanced detectors.
  • C. LHC run
    An LHC run is a defined operational period of the Large Hadron Collider during which proton or ion beams are circulated and collided under specific energy and luminosity conditions to collect experimental data.
  • D. operational period of the Large Hadron Collider
    The operational period of the Large Hadron Collider is the span of time during which the accelerator is actively running experiments, colliding particles, and collecting data under defined technical and safety conditions.
  • E. Fermilab experiment
    A Fermilab experiment is a high-energy physics research project conducted at the Fermi National Accelerator Laboratory to investigate fundamental particles, forces, and the structure of matter using particle accelerators and detectors.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008f5a2748190bce7a39aabf87a6d completed March 22, 2026, 3:21 p.m.
Created at: March 22, 2026, 3:32 p.m.